Abstract

The legal qualification of the actions of the subsoil user on removal of the fertile soil layer is investigated In the article. These actions are the land protection measures and also are included in the complex of technical measures for land reclamation. In the process of work aimed at preparing the use of subsoil, it becomes especially important to understand the removal of the fertile soil layer as the responsibility of a special subject. Conclusion: it is necessary to develop the legal regulation of land relations in the area under study at the federal level so that the rules for carrying out such work become unified and as close in content as possible to the specifics of subsoil use in different situations. It is necessary to resolve the conceptually significant issue of the need and justification for the rule on obtaining a permit for work related to soil disturbance, which is in regional and municipal regulatory legal acts. The author substantiated her opinion that the rules for land protection are fully taken into account in the technical project and the land reclamation project, when its development is required by law.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.