Abstract

The results of the study of the developed mathematical model and laboratory installation of the lifting engine of a mining excavator, which allow, with the least intervention in the control system of the excavator, to receive a current signal proportional to the weight of the rock mass moving in the bucket are presented

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call