Abstract

The article is dealt with the analysis of the Krasnodar water reservoir operation carried out under various options for regulating river flow. The considered options for water reservoir management were implemented in accordance with the current operation schedule and new regulations developed on the basis of simulation modeling using the IMIT-BALANS model which uses optimization elements. Previously this model was adapted by means of a more detailed discreteness of intra-annual intervals. Comparison of the results of the reservoir operation in relation to the deficient planned water yield for dry year conditions showed that the developed new regulations for reservoir management for low water years are much more effective. Their use by the decision-maker (DM) would reduce deficit of water consumption provided that short-term and medium-term runoff forecasts are used.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.