Abstract

The paper presents the results of monitoring the technical condition of floors and beams, which are elements of the building structures of a multi-storey frame building. The reasons for the need to perform a survey of a frame building, which has a long forced break in construction, are determined. It is shown that the downtime of the unfinished building and the impact of external factors had a negative impact on the technical condition of the building structures, as a result of which it became necessary to determine the suitability of the building for normal operation. For this purpose, the actual technical condition of the floors and beams of the building was determined. The methodical and instrumental equipment of work on the inspection of building structures is considered. The results of inspection of structures and reinforcement of ceilings and beams are given. The reinforcement system was checked in accordance with the current regulatory documents. The calculation of the strength of concrete floors and beams was performed. Defects and damages of ceilings and beams recorded in the list of defects and damages are investigated. The results of verification calculations of reinforced concrete floors and beams are given. The category of the technical condition of reinforced concrete floors and crossbars is considered. Recommendations for the repair of reinforced concrete floors and crossbars have been developed. The main conclusions are made based on the results of the inspection of reinforced concrete floors and beams.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call