Abstract

ABSTRACT:The aim of this study is to evaluate the performance of the GHP system with 45 cast-in-place energy piles(CEP) for a commercial building. In order to demonstrate the feasibility of a sustainable performance of the system, transient simulations were conducted over 1-year and 20-year periods, respectively. The 1-year simulation results showed that the maximum and minimum temperatures of brine returning from the CEPs were 23.91℃ and 6.66℃, which were in a range of design target temperatures. In addition, after 20 years’ operation, these returning temperatures decreased to 21.24℃ and 3.68℃, and finally reached to stable state. Annual average extraction heat of cast-in-place energy piles was 94.3 MWh and injection heat was 65.7 MWh from the 20 years of simulation results. Finally, it is expected this GHP system can operate with average heating SPF of more than 3.45 for long-term.Keywords:Cast-in-place energy pile(현장 타설 에너지파일), Ground heat exchanger(지중열교환기), Geothermal heat pump system(지열 히트펌프 시스템), Cooling and heating performance(냉난방 성능), Transient simulation(동특성 시뮬레이션)

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.