Abstract

The time schedule is the main source of information in construction management. The overall efficiency and success of the project ultimately depends on its quality. At present, the concept of "technology for the construction of an object" is associated with the technological sequence of works of the object, the relationship between them, but there are practically no deep theoretical studies in the field of determining the quantitative relationships between interrelated works. The traditional approach to determining quantitative ratios based on previously adopted organizational decisions is fully justified for organizational and technological planning. But in order to organize the production of work, that is, to make the appropriate organizational decisions for the implementation of specific volumes of work, it is necessary to preliminarily determine these volumes.In the process of determination, technological requirements must be taken into account, which dictate the quantitative relationships between interrelated works. Purpose of the study. Building a model that takes into account technological dependencies in the process of performing construction and installation work. Materials and methods. The work used publications available in open sources on the organization of construction work, as well as regulations used in the Russian Federation, regulating the construction industry. Results. A new concept of construction technology of an object is given, as a quantitative and qualitative assessment of technological links between works, which determine the possibility of planning works and organizing production, depending on the state of the previous ones. This definition allows us to formulate the essence of modeling the construction technology of an object, namely, the establishment of technological links between the works and the determination of the minimum volumes on the previous one, which open up the possibility for planning a technologically interconnected volume on the subsequent work. The article has developed and presented such a model (model of object technological dependencies), which describes the technological interrelationships of works and their quantitative estimates at the beginning and end of works. The possibilities of the model of object technological dependencies in the development of management decisions from the point of view of the general functions of construction management are shown. Conclusion. The described model can successfully serve as a technological basis for planning construction and installation works, making organizational decisions, monitoring the progress of work, as well as developing management decisions in the process of construction production. With its help, you can analyze the progress and status of work in each planning period of the planned year.

Highlights

  • Согласно нормативным и руководящим документам, управление строительством объекта осуществляется на базе календарных планов в составе проекта организации строительства (ПОС) и проекта производства работ (ППР) [1, 2]

  • The time schedule is the main source of information in construction management

  • A new concept of construction technology of an object is given, as a quantitative and qualitative assessment of technological links between works, which determine the possibility of planning works and organizing production, depending on the state of the previous ones

Read more

Summary

Краткие сообщения

УПРАВЛЕНИЕ СТРОИТЕЛЬСТВОМ ОБЪЕКТА НА ОСНОВЕ МОДЕЛИРОВАНИЯ ТЕХНОЛОГИИ СТРОИТЕЛЬСТВА ОБЪЕКТА. Дано новое понимание технологии строительства объекта – количественная и качественная оценка технологических связей между работами, которые определяют возможность планирования работ и организацию производства в зависимости от состояния предшествующих. Такое определение позволяет сформулировать суть моделирования технологии строительства объекта, а именно установление технологических связей между работами и определение минимальных объемов на предшествующей, которые открывают возможность для планирования технологически взаимосвязанного объема на последующей работе. Понятие «технология строительства объекта» можно сформулировать следующим образом: «это количественная и качественная оценка технологических связей между работами, которые определяют возможность планирования работ и организацию производства в зависимости от состояния предшествующих». В этом случае суть моделирования технологии строительства объекта заключается в установлении технологических связей между работами и определении минимальных объемов на предшествующей, которые открывают возможность для планирования технологически взаимосвязанного объема на последующей работе. Планирование объёмов работ, которые необходимы для достижения ТЭП, осуществляется на основе календарного плана и его составляющего графика строительства объекта в составе ПОС и ППР.

квартал
CONSTRUCTION MANAGEMENT BASED ON MODELING TECHNOLOGY OF OBJECT CONSTRUCTION