Abstract

The article is dedicated to the research of operation efficiency increase of the boiler unit TGMP-344A by introducing the utilization unit into the technological scheme. The article considers the possibility of closed type condensing heat recovery unit use and utilization of an exhaust gas potential for raw water heating before a water treatment system at CHP.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call