Abstract

The UK Met Office Unified Model at the KMA has been operationally utilized as the next generation numerical prediction system since 2010 after it was first introduced in May, 2008. Researches need to be carried out regarding various physical processes inside the model in order to improve the predictability of the newly introduced Unified Model. We first performed a preliminary experiment for the domain (, 10 km, 38 layers) smaller than that of the operating system using the version 7.4 of the UM local model to optimize its physical processes. The result showed that about 7~8% of the improvement ratio was found at each stage by integrating four factors (u, v, th, q), and the final improvement ratio was 25%. Verification was carried out for one month of August, 2008 by applying the optimized combination to the domain identical to the operating system, and the result showed that the precipitation verification score (ETS, equitable threat score) was improved by 9%, approximately.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.