Abstract

For electrification of decentralized energy consumption facilities, as a rule, constructed an autonomous diesel power station, the operation of which involves the use of diesel fuel mainly to start the unit, and the rest of the time the diesel generator sets operate on treated oil. To reduce fuel consumption (treated oil) and reduce the load on diesel generators, it is proposed to use as the main power source for oil pumping stations, located in regions with high wind energy potential – an autonomous hybrid power-supply system – wind-diesel power station with a parallel operation of the wind and diesel power station. The article provides an operation scheme of a wind-diesel power station. In case when there is no possibility to place diesel generator sets of the equivalentcapacity in the powerhouse hall, then the article describes the optimal calculation algorithm for power distribution between diesel generator sets with different capacity, based on solving simultaneous equations by using the Lagrange multiplier method. The article also provides a practical example of the algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.