Abstract

In this paper, the solution of a joint temperature filtration problem is considered in relation to a soil dam in a cryolithozone. The dam is designed according to one of the principles adopted for the design and construction of structures in such climatic conditions. A description of the methodology used is given. Using the PLAXIS software package, a numerical solution to the problem was obtained, taking into account the phased construction of the structure, repair and reconstruction of the structure caused by the occurrence of an emergency situation after rapid filling of the reservoir. The obtained results of solving the temperature filtration problem revealed problems with ensuring the "frozen" regime of the structure and the need to take additional measures for this.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.