Abstract

지하수 , 지하댐, 유효공극률 , 유황곡선 , 대체 수자원This paper aims to calculate the increase in groundwater quantity following groundwater dam construction, and toassess its impact on surface water. In the study area of Osib-cheon, Yeongdeok, we estimated groundwater quantity,groundwater level, and effective porosity, and examined surface water fluctuations with respect to the increasedgroundwater quantity based on the flow duration. The results reveal that the increased groundwater quantity was atmost 91,746 m

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call