Abstract

지하수 , 지하댐, 유효공극률 , 유황곡선 , 대체 수자원This paper aims to calculate the increase in groundwater quantity following groundwater dam construction, and toassess its impact on surface water. In the study area of Osib-cheon, Yeongdeok, we estimated groundwater quantity,groundwater level, and effective porosity, and examined surface water fluctuations with respect to the increasedgroundwater quantity based on the flow duration. The results reveal that the increased groundwater quantity was atmost 91,746 m

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.