Abstract

At present, only 10-15% of the total volume of construction waste is recycled in Russia. Most of the waste has to be buried in special landfills, the capacity of which is almost exhausted. The reasons of low volumes are the following: slow re-equipment process of recycling enterprises; imperfection of legislative base for regulation of relations in the field of operation; lack of state support and economic incentives in the field of construction waste recycling. These problems could be solved by means of providing tax benefits, loans with reduced rates, subsidies from the budgets of different levels so as to implement resource- and energy-saving projects in the field of recycling construction waste and its use as raw material in the production of construction materials with low cost and improved quality characteristics, in order to use it in civil, industrial and road construction, within the mechanism of public-private partnership based on concession.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call