Abstract

The solution of the theoretical problem is given, which made it possible to consider the process of formation and determine the formulas for calculating the main parameters and volume of the backfill pad at the contact of cover and bedrock. Stabilization grouting pad allows you to strengthen and waterproof the undermined rock mass. The parameters of the formation of a stabilization cushion under an emergency building at the contact of decompacted loams and fractured sandstones are calculated.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.