Abstract

The problem of production cycle improving of the gas turbine engine unit is considered. The analysis of existing gas turbine engine unit production cycle was carried out and the identification of its main shortcomings are considered. The paper purpose is to develop a new production cycle for release the products with the assembly quality increase in a shorter production time, the use of selective assembly with the repeated cycles exclusion and with use of an electronic database replenished with actual dimensions using a control and measuring machine, which will speed up the process of controlling parts for compliance assembly requirements.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.