Abstract

Competitiveness of Gaysky GOK depends on energy costs, including the purchase of electricity for technological needs. Turbine units additional load is often considered in the context of optimization of power plant operation under changing conditions of electricity demand. By increasing the turbine load at certain times or when necessary to respond to changes in grid load, it is possible to improve resource utilization efficiency and reduce power generation costs. This article describes the methods of increasing the efficiency of steam-turbine units of thermal power plant of PJSC "GAYSKiy GOK", due to additional loading of operating turbine units up to nominal capacity. At low cost of electricity produced by the CHPP, compared to electricity purchased on the wholesale electricity market, which will reduce the company's costs for electricity purchase. 
 Steam, which is produced during the operation of turbine units in nominal mode and in the winter period is used for heating the city, in the fall-summer-spring periods it is proposed to use for the operation of evaporator plant, which will be used for desalination of clarified water, which after processing will be used in the technological process of the CHPP itself, as feed water for boilers, which will eliminate the need for water treatment of the CHPP.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call