Abstract
Abstract To develop large-scale complex systems, many organizations have attempted to improve the processes specified in systems engineering (SE) and project management (PM) by adopting CMMI (Capability Maturity ModelIntegration). On the other hand, most domestic organizations that already acquired CMMI level 3 have focused on SE&PM practices while providing less investment in building up the environment for institutionalizing those processes. In such organizations, the process maturity without advancing to institutionalization can be neither enhancednor maintained. To resolve the problem, the following remedies can be suggested. A standard process should firstbe defined to meet the business mission of the organization and to carry out the process successfully, the people should be properly trained and the appropriate tools be provided. In this study, a maturity model to accomplish institutionalization was examined based on the aforementioned P-P-T (Process-People-Tool) concept. The model proposed would be useful in developing strategies and plans for process institutionalization when the organizationsare in the preparation stages for a CMMI certificate or have already acquired one.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Korea Academia-Industrial cooperation Society
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.