Abstract
The results of calculating the sediment of the pile foundation base in accordance with the require-ments of SNP 2.02.01-83* and SP 22.13330.2016 «Soil bases of buildings and structures» are pre-sented
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have