Abstract

A large-scale reform of relations in the electricity sector, which has been taking place in recent years in Ukraine, is explained by the desire of integration into European Union, and these prescripts, in particular, by the Law of Ukraine “On ratification of the Association Agreement between Ukraine and the European Union”. One of the important steps towards Ukraine's integration into the EU is the accession of the United Power System (UPS) to the Association of Transmission System Operators of Continental Europe (ENTSO-E) for which, in particular, in July 2019, a new electricity market model was introduced in Ukraine, built on principles compatible with the EU, currently functioning in accordance with the provisions of the Law of Ukraine "On the Electricity Market of Ukraine" and by-laws, in particular, "Market Rules", "Market rules" for the day ahead and intraday market ". The conditions of parallel operation of the UPS of Ukraine with the energy systems of neighboring countries that are part of ENTSO-E are considered, in particular, the structure of generating capacities, characteristic graphs of electrical loads, the presence and capacity of interstate power transmission lines and the value of the maximum allowable import and export capacity. The data presented can be used as input information for modeling the operating modes of the generating capacities of individual power systems, ensuring the readiness to integrate the power system of Ukraine with the power system of Continental Europe ENTSO-E and serve as the basis for modeling the synchronous functioning of the UPS of Ukraine in parallel operation with the power systems of neighboring countries. Keywords: energy system, ENTSO-E, technological conditions

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call