Abstract
The article emphasizes the importance of developing the Arctic and reveals the existing problems of construction in this zone. The existing methods of construction of quick-assembly structures, including the use of pneumatic formwork, are analyzed. A crane-free technology for the construction of a domed building using pneumatic formwork is proposed, with subsequent filling of the inter-deck space with foam material based on Quad Core.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.