Abstract

The article emphasizes the importance of developing the Arctic and reveals the existing problems of construction in this zone. The existing methods of construction of quick-assembly structures, including the use of pneumatic formwork, are analyzed. A crane-free technology for the construction of a domed building using pneumatic formwork is proposed, with subsequent filling of the inter-deck space with foam material based on Quad Core.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call