Abstract
In the context of the paper, carried out study complex is devoted to geomechanical estimation of safe development of ore reserves including barrier pillar within protective pillar of shaft of Irtishskaya Ore Mine with determination of influence rate of occurring stresses and strains in a solid on its condition and on capital workings and ground surface. Due to absence of active reserve reproduction of mineral raw materials at active ore mines, issues of pillar redevelopment become extremely important. It is established that in some deposits, losses in boundaries of protective pillars for protective objects reach 30 and more percent from balanced reserves. The possibility of safe extraction of parts of reserves from protective pillar of shaft without negative consequences for mine operation and for objects located at daylight surface is justified, based on analytical solutions and finite-element simulation in terms of Irtishskaya Mine. The most significant issue in the paper is using of mathematical simulation considering geo-structural features of the deposit, solid lithology, physical and mechanical properties of rock geo-metrical difficulty of mining objects and regulatory documentation for significant of extension of knowledge about studying of stability estimation of workings and ground surface. It is established that as main safety way for mine shaft ore barrier pillars should be leaved when reserves from protective pillar is depleted.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.