Abstract

The article substantiates the possibility of carrying out work on the extraction of non-metallic building materials from the riverbed of the Pripyat River on the basis of comparing the existing flow and determining the predicted ecological flow of the river. The numerical simulation of the longitudinal flow has showed a redistribution of velocities within the slots and technological breaks, which form sections with a flow velocity of less than 0.3 m/s with-in the deepened part of the slot, and increased velocities of more than 0.9 m/s in the sections of technological breaks, which increases the intensity of sediment deposition. The volume of possible intake of material from the river amounted to 33122.5 m3 has been established, which corresponds to carrying out work no more than once every 3 years with mandatory re-peated environmental assessment of hydraulic and hydrological processes. The total com-pensation payments for the harmful effects of the planned works on the ichthyologic fauna of the Pripyat River in the Pinsk district of the Brest region have been determined.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.