Abstract
The unstable nature of solar power plant (SPP) power output in the network determines the need for a comprehensive study of the relevant control processes and their impact on the operation of the power system, especially from the point of view of influence of processes of generation capacity in the SPP on the frequency, and on the relevant processes of automatic frequency and power control (AFPC). The mathematical model of the generation processes on the SPP included in the AFPC model allows to investigate the processes of regulation in the AFPC systems with traditional regulators (generators), and in the AFPC systems with fast controllable loads. On the example of interconnected power system (IPS) of Ukraine presents the results of experiments with the mathematical model of the SPP given in the article. It is established that for generators-regulators is a key limitation on the speed of the power set/reset, unlike controllable loads for which key is a maximum power limitation. It is revealed that under the condition of maximum power SPP equal to the maximum power of the generator-regulator of the power plant (3 GW) speed of the power set/reset of hydroelectric power provides effective regulation for the permissible frequency deviation of 0.02 Hz. Ceteris paribus, neither coal-fired nor oil-gas thermoelectric power station is not able to hold the frequency deviation even in the range of 0.2 Hz.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.