Abstract

In the weapon system requirement planning and concept phase, in order to secure an appropriate budget for project promotion of the weapon system to be developed, the total cost should be estimated based on the data of similar weapon systems. However, Similar systems information and cost data at this phase, the environment and institutional support for systematically managing and accumulating information generated during the process of weapon system development, production, operating and maintenance are insufficient. Currently advanced countries are trying to minimize the shortage of information by using a ace-based reasoning model equipped with a database. However there is a lack of accumulated weapon system cases, and it is necessary to check whether it can be used in the domestic weapon system R&D process. Therefore, In this paper presents a domestic utilization plan of CostIQ and CBR model used in the process of R&D of overseas weapon systems. we verified whether information and cost data of similar systems were appropriately recommended only by the desgin and performance requirements of the development target system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.