Abstract

Among the most important problems which faced the new approach is the wide use of old approach , particularly the traditional approach ( general contractor ) and the bill of quantity contract, and this were commonly used in the course of the application of fast – track approach in spite of unfulfilling the execution requirements for the fast – track , so It became necessary to look for certain contract rules to be used as a substitute suited all conditions and cases after concluding lessons from the local experiments in rebuilding issues . This research aims at analyzing the subject of shortening time factor taking in consideration the effect all the effective factors which leads to increase the cost and time A scientific methodology was followed in both theoretical and practical phases of the study . A detailed statistical analysis of the study was incorporated using questionnaire and interview method to evaluate the effective factors directly or indirectly on fast – track approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.