Abstract

Interest in energy efficiency and savings have been rising internationally. For this reason, the domestic housing construction in the area of power equipment is being actively studied. Currently approximately 400,000 per year of domestic housing is being built. Applies to housing construction during the current transformer capacity low utilization and load factor has been applied has been designed. In other words, excessively high reserve capacity has been applied. According to this problem, initial facility costs and power losses will cause because transformer low utilization be appropriated. Thus, the energy efficiency drops. In this paper, analysis of past utilization of the housing transformer, and applying an appropriate demand factor has been analyzing the energy loss reduction. this analysis of current domestic conditions for the proper housing transformer scheme is to calculate the capacity.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call