Abstract

The article presents the peculiarities of the Gremyachinskoe potash salt deposit development conditions, which influence the choice of type and justification of anchoring design. The practice of anchoring of mine workings in salt rocks at great depths is generalized. The factors influencing the choice of the type and parameters of anchoring of mine workings are systematized. The parameters of anchor support are substantiated on the basis of establishing the regularities of deformation of the system "anchor-rock massif" in time to ensure the operational reliability of the support and stability of mine workings with the definition of parameters of rational use of improved designs of anchor support.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.