Abstract

Urban plan facilities unexpected in long-term is providing violation of the ownership right by the prolongment of the project because of the cost. By the decreasing number of the student because of low birth rate nationally, school facilities has been designated but discharged as urban planning facilities. Comparing with the Regarding negotiation system, betterment based on the case of canceled as school facilities to be developed and the following is the result. First, according to each analysis type, betterment has been analyzed variously from 38.9% to 512.0% comparing with officially assessed land price. Second, analyzed by each method of rezoning was shown from 42.5% to 622%, considering the increase rate of land price by developing was shown from 54.6% to 971.9%. Third, considering the charge for development and the increase rate of land price was shown from 3.5% to 128.9%. It would be used by the basic research about proper betterment estimation rate for the future betterment recapture.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call