Abstract

The results of calculation of two stage gas turbine unit intake air cooling processes with previous cooling by absorption lithium-bromide chiller and deep cooling by ejector chiller are presented. The efficiency of the use of absorption lithium-bromide chiller cooling potential for changeable heat loads is analyzed. A scheme of cooling system with accumulating of surplus absorption lithium-bromide chiller cooling potential during decreased heat loads and its spending at increased heat loads has been proposed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.