Abstract

The methods of increasing the throughput capacity of railway lines on the basis of elimination of speed limits at station necks by improving switching service facilities are considered. The potential of implementing these methods by changing the geometry of switch throws and their combinations is illustrated.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call