Abstract
The developed SM-model, describing the suspended matter concentrations in water environment, was used to assess the consequences of the works on dredging and dumping ground during the reconstruction and modernization of the water body area in the Pionersky Port (Kaliningrad region). The complex of recreated works includes 11 stages of the dredging works during which the various types of bottom sediments are extracted, some part of these sediments are transported outside the port water area and discharged into the marine underwater dump, while other their part are used for hydraulic engineering works in the port area. At the dredging and dumping the sediments, additional zones of water turbidity are formed (with a suspended matter concentration > 50 mg/L), its deposition causes the formation of a layer of sediments on the bottom. For each work stages, the technological data on the currents in the port water area are used for mathematical modeling and calculations of the amounts of various types of sediments extracted from the bottom, their redistribution over the sea area, the concentration of suspended matter in sea water, and the indicators (areas and volumes) of the emerging turbidity zones water due as a result of the construction works. Calculated data may be used to compile a report “Assessment of influence on the water environment state” (or AIWES) in the frame of these works.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.