Inefficient operation of traffic in work zone areas not only leads to an increase in travel time delays, queue length, and fuel consumption but also increases the number of forced merges and roadway accidents. This study evaluated the safety performance of work zones with a conventional lane merge (CLM) configuration in Louisiana. Analysis of variance (ANOVA) was used to compare the crash rates for accidents involving fatalities, injuries, and property damage only (PDO) in each of the following 4 areas: (1) advance warning area, (2) transition area, (3) work area, and (4) termination area. The analysis showed that the advance warning area had higher fatality, injury, and PDO crash rates when compared to the transition area, work area, and termination area. This finding confirmed the need to make improvements in the advance warning area where merging maneuvers take place. Therefore, a new lane merge configuration, called joint lane merge (JLM), was proposed and its safety performance was examined and compared to the conventional lane merge configuration using a microscopic simulation model (VISSIM), which was calibrated with real-world data from an existing work zone on I-55 and used to simulate a total of 25 different scenarios with different levels of demand and traffic composition. Safety performance was evaluated using 2 surrogate measures: uncomfortable decelerations and speed variance. Statistical analysis was conducted to determine whether the differences in safety performance between both configurations were significant. The safety analysis indicated that JLM outperformed CLM in most cases with low to moderate flow rates and that the percentage of trucks did not have a significant impact on the safety performance of either configuration. Though the safety analysis did not clearly indicate which lane merge configuration is safer for the overall work zone area, it was able to identify the possibly associated safety changes within the work zone area under different traffic conditions.
Read full abstract