The paper presents a method for assessing the daylighting of premises, which can be used directly at the stage of architectural and construction design of buildings in building information model (BIM) software complexes. The calculation method is based on the calculation of the sky factor by constructing a solid angle formed by the calculated point and the light opening of the outer wall. These operations are proposed to be performed automatically using visual programming programs that work together with the BIM complexes. Since the considered calculation method is based on the idea of the physical meaning of the daylight factor, it can be used to evaluate the daylighting according to almost any regulatory method. At the same time, all the data necessary for the calculation can be obtained directly from the building information model. The method is universal and can be used both for the calculation of side and top daylighting, considering the surrounding development. The proposed method can also be used as a tool for finding the best design solution for translucent structures of the designed building based on the requirements of thermal protection, daylighting, and safety.
Read full abstract- All Solutions
Editage
One platform for all researcher needs
Paperpal
AI-powered academic writing assistant
R Discovery
Your #1 AI companion for literature search
Mind the Graph
AI tool for graphics, illustrations, and artwork
Unlock unlimited use of all AI tools with the Editage Plus membership.
Explore Editage Plus - Support
Overview
34 Articles
Published in last 50 years
Articles published on Sky Factor
Authors
Select Authors
Journals
Select Journals
Duration
Select Duration
34 Search results
Sort by Recency