In the present paper the main results of the pre-operational studies related to the energization maneuver of a Half-Wavelength Transmission Line (AC-Link), are presented. The simulations were performed in PSCAD with actual Brazilian system data. Specifically the following studies were performed: electromagnetic transient studies of energization maneuver considering no fault and the occurrence of fault along the trunk; dynamic analysis of generator units that will energize the AC-Link; TRV on the circuit-breaker that will energize the trunk. The main conclusion is that the AC-Link energization experiment can be implemented without jeopardizing or causing time-life reduction of the equipment involved in the experiment, which comprises the generator unit that will energize the trunk, the step-up transformer, the arresters that will be kept during the experiments, as well as the circuit-breaker that will energize and then trip the AC-Link.
Read full abstract