Part of the development history of the Shire of Warringah is outlined. Past engineering standards are discussed with an outline of costs to augment the existing pipe systems within the Shire to cater for the required design rainfall events. Standards which apply to today's developments are then outlined with specific reference to flood mitigation and total catchment management.