This article discusses the methodologies presently available for analyzing the contribution of “external initiators” to overall risks in the context of PRA (probabilistic risk assessment) of large commercial nuclear power reactors. “External initiators” include earthquakes, fires and floods inside the plant, external floods, high winds, aircraft, barge, and ship collisions, noxious or explosive gases offsite, and so on. These are in contrast to “internal initiators” such as active or passive plant equipment failures, human errors, and loss of electrical power. The ability to consider external initiators within PRA has undergone major advances in recent years. In general, uncertainties associated with the calculated risks from external initiators are much larger than those associated with internal initiators. The principal uncertainties lie with development of hazard curves (such as the frequency of occurrence of an event exceeding a given size: for example, the likelihood of a hurricane with winds exceeding 125 knots). For assessment of earthquakes, internal fires and floods, and high winds, the methodology is reasonably mature for qualitative assessment but not for quantitative application. The risks from other external initiators are generally considered to be low, either because of the very long recurrence time associated with the events or because the plants are judged to be well designed to withstand them.
Read full abstract