Abstract

AbstractZinc‐ and lead‐containing wastes are often mixed with construction and demolition wastes in many factories, generating abundant of heavy metal‐enriched hazardous waste. In the present study, a novel integrated process of air classification, alkaline leaching, and water washing dechlorination was proposed for the efficient recycling of Zinc (Zn) resources. The first air classification process was realized via venturi tube, wherein the content of Zn could increase by 20 wt.%. After that, the product underwent an alkaline leaching process. Results showed that Zn recovery rate increased with fine particle sizes, and a 65% recovery rate was obtained under the following conditions of 5 mol/L NaOH, liquid/solid 10:1, and leaching time 1 h. Finally, water washing associated with microwave and ultrasonic treatments could remove over 85% of Cl and other water‐soluble salts. All the results indicated that the integrated method had an excellent recovery rate for Zn resources from construction and demolition wastes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.