Abstract

Based on the design and construction of the second Yangtze River bridge in Wuhu (hereinafter referred to as Wuhu Second Bridge), this article introduces the structural system of a full-floating cable-stayed bridge with four cable planes, a single-column tower and separated steel box girders. A series of innovative structural measures are taken to improve the safety and economy of the bridge, such as the looping stayed cable anchorage system, the diagonal damping constraint system, and the externally prestressed segmentally assembled box girders used in the approach bridge. In addition, finite element analysis software is used to study and analyse the mechanical characteristics of the bridge. Also, the reliability of the structural anchorage system and damping constraint system is verified. Finally, the construction technology adopted for Wuhu Second Bridge is briefly described.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.