Abstract

This paper considers the problem of scheduling a given set of jobs on two identical parallel machines. Each job must be processed on one of the machines, and prior to processing, the job is set up on its machine using one server; the latter is shared between the two machines. This problem is known as the two-machine scheduling problem with a single server, and our objective is to minimise the makespan. A worm optimisation algorithm (WO) is introduced for this NP-hard problem, and its performance is compared to ant colony optimisation, simulated annealing, and genetic algorithm, as well as exact approach. The superiority of WO over the other algorithms is obtained through extensive computational results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.