Abstract
The standard construction contract in the UK, such as JCT 2005, is designed to balance time, quality and cost. Typically, the contract documents consist of a bespoke design described by a full package of drawings and a specification describing quality, techniques and materials. These enable a contractor to offer a fixed price for the work and establish a programme and the aim is to provide a level of financial security that leaves little to error or to contingent forces. That, at least, is the theory. In practice, there are few contracts that run as smoothly as the theory suggests, which accounts for the myriad case law in this area.In preparing the contract documents, an architect conventionally begins their work by acting as agent for the client. Once appointed, s/he develops the brief with the client and/or users, designs the building and guides the scheme through the regulatory system, describing it in sufficient detail to allow a contractor to arrive at an accurate cost. After this, the ways in which a building can be procured can vary considerably. This article focuses on what happens under a Design and Build (D&B) contract.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.