Abstract

An efficient integration of rail transport into the hinterland traffic is an important topic for ports all around the world. In this context, we treat a scheduling problem where multi-trailer trucks (denoted as road trains) deliver containers to some gantry crane, which successively loads the boxes onto freight trains. A road train carries up to a dozen containers, so that a lot of energy is consumed especially when setting a road train in motion. Thus, there is a basic trade-off between the effort of road train and gantry crane. The more often a road train is relocated, the higher its own demand for energy, but the lower that for moving the crane when processing containers rather from nearby holding positions and vice versa. This paper formalizes the novel problem setting and suggests a heuristic decomposition approach, which determines the stop locations of the road train and schedules the gantry crane during the loading process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.