Abstract

PurposeThe purpose of this paper is to assess the determinants of the early termination of infrastructure projects implemented under public–private partnerships (PPP), concessions or privately managed divested assets.Design/methodology/approachCross-section and duration model estimations were applied to a sample of 2,655 infrastructure projects implemented in Latin America and the Caribbean for the period 1993–2017. Estimation techniques consist of a logistic model and cox proportional hazards model (CPHM) applied to alternative specifications, including diverse causal factors.FindingsEvidence is found that early termination of infrastructure projects is determined by intrinsic and extrinsic factors. Among the intrinsic factors, the main characteristics of projects that increase the likelihood of failure are the size or scale of the project, the sector in which the project is developed (transport and water and sanitation) and being investments in divested assets. Extrinsic factors that showed a negative impact on the risk of early termination are good regulatory quality and domestic macroeconomic stability. Likewise, external real and financial shocks also contribute importantly to explain the likelihood of early termination of infrastructure projects.Practical implicationsThe results reveal that particular care must be put in design and supervision of large-scale projects, either in transport or water and sanitation. As well, risks associated with external shocks must be explicitly acknowledged in project design, with appropriate remedies and safeguards. The prevalence of relatively high rates of early termination in projects in divested assets in contrast with PPP suggests the importance of introducing simpler way out mechanisms for concessionaires. Finally, the results show the key importance of institutional factors like regulatory quality in determining project failure on economic performance of infrastructure projects.Originality/valueIn contrast to the previous literature, the analysis shows the decisive role played by financial external factors and institutional factors of Latin American and Caribbean countries in early termination of private participation in infrastructure projects. As well, the finding of a higher likelihood of failure in projects that involve investments in divested assets versus concession or PPP suggests the need of investigate further the tradeoffs regarding the balance that must exist among guarantees offered to investors in infrastructure projects and the need to keep contractual decisions in line with market signals.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.