Abstract

First, we would like to thank Prof Veysel Eroglu, the TR Minister of Forestry and Water Affairs of the time, for his great contributions in the realization of this unique project, and his bold vision. Due to the efforts and contributions in the project design, planning and construction phases, we are thankful to Alarko Contracting Group, Intec Engineering DV, Art? Project, Danish Hydraulic Institute (DHI), AES Engineering Ltd, Firat Plastic Inc., and Kalyon - Sigur Ros Joint Venture, together with all stakeholders working on design and construction of the land structures of the project. We also extend our gratitude to the managers & employees of the General Directorate of State Hydraulic Works (DSI) for their efforts in this project

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.