It is always quite difficult to accurately measure boiler drum water level in power plant. Though the effect of false measurement of water level can be reduced with some devices, the effect of deviation of boiler drum water level to the monitoring and alarm system, even to the control of drum water level, and so on, cannot be surmounted. Because of these reasons, the accurate water level alarm signal cannot be provided and the water level control measures cannot be applied. In order to solve this problem, a water level deviation analysis method is presented for analyzing boiler drum water level. Based on the analysis of boiler drum water level related running parameters, the relational model of water level deviation under different working conditions and its parameters is constructed. By analyzing this model, the specific impacts of the main factors can be fixed. Thus the drum water level deviation can be reduced by adjusting running parameters without changing unit load. And then the measurement of drum water level can be more accurate only if power plants have accurate measuring devices. Therefore, the boiler drum water level can be more accurately monitored and controlled. So, this innovation is important in ensuring the safe running of power plant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.