Abstract

Recently built for the Bus-HOV lane on the C-58 Motorway, the Viaduct consists of an elevated structure in which the piers are located in the space between the two decks of an existing viaduct.The new deck consists of a spatial steel tube structure which supports a concrete platform, on which the carriageway runs.Unknown for this type of structure, the construction system developed consisted in erecting 100% of the piers and deck without the support of the existing viaduct's decks which were only occasionally used for auxiliary aid jobs, control, and inspection, whilst traffic did not have to be cut off at any time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.