Abstract

In view of the variation law of water level in water injection drill between dou?ble-system layers of hard rock strata in Datong mining zone, the failure process and mechanism of boreholes during propulsion are analyzed by the numerical sim?ulation and the test measurement in this paper. After the coal seam is fully mined, it can be divided into the advanced deformation zone, the bending deformation zone and the compaction stable zone. Borehole damage intensifies from top to bottom. The junction of siltstone and sandy mudstone is a high-risk position. The results are verified by the water level measurement and the borehole peeping.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.