Abstract

In traditional dental implant therapy, the time between implant placement and delivery of the definitive prosthesis can be long and uncomfortable for a patient wearing a conventional removable denture on an atrophied ridge. New clinical protocols, often with tilted implants, are being used to immediately restore mandibular implants with interim restorations, thus shortening the patient's return to function. However, these conversion type interim restorations do not decrease the time to definitive prosthetic rehabilitation. The Ohio State University (OSU) developed an immediate load surgical and prosthetic protocol to compensate for the disadvantages of previous techniques. With this protocol, a custom, definitive, screw-retained metal-resin fixed prosthesis can be delivered 2 to 4 days postoperatively and has been described using 5 implants. This clinical report presents the OSU immediate loading protocol, combined with a tilted implant technique, for the fabrication of a mandibular metal-resin implant fixed complete dental prosthesis (MRIFCDP) in 3 days postoperatively and with only 4 implants. Replacing the mandibular dentition with an immediate load-fixed metal-resin prosthesis by means of the “final-on-four” technique resulted in a custom, definitive, and functional restorative solution immediately after surgery.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.