Abstract

This paper explores the sizing optimization of stand -alone hybrid energy system (HES) in southern Iraq (Thi Qar province) for supply stand-alone households by the electricity. HES consist of three components (solar cell (PV), diesel generator (DG) and battery storage (BS)). Particle swarm optimization (PSO) used in this study for find optimal sizing of the HES to minimizing multi-objective, first objective is to minimizing the total system cost (TSC) that lead to minimizing cost of energy (COE). Second objective is to minimizing total emission CO2 (TECO2). The constraint of the optimization is the reliability (100 %) mean continuous provide the load demand by the electricity. The results of the optimization show the ability the algorithm to minimizing the multi-objective with continuous supply the load by the electricity through life cycle of the project (25) years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.