Abstract

Scheduling problems are essential for decision making in many academic disciplines, including operations management, computer science, and information systems. Since many scheduling problems are NP-hard in the strong sense, there is only limited research on exact algorithms and how their efficiency scales when implemented on parallel computing architectures. We address this gap by (1) adapting an exact branch-and-price algorithm to a parallel machine scheduling problem on unrelated machines with sequence- and machine-dependent setup times, (2) parallelizing the adapted algorithm by implementing a distributed-memory parallelization with a master/worker approach, and (3) conducting extensive computational experiments using up to 960 MPI processes on a modern high performance computing cluster. With our experiments, we show that the efficiency of our parallelization approach can lead to superlinear speedup but can vary substantially between instances. We further show that the wall time of serial execution can be substantially reduced through our parallelization, in some cases from 94 h to less than 6 min when our algorithm is executed on 960 processes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.