Abstract

This study proposes a risk analysis model based on the Bayesian network for diaphragm wall deflection to ensure safety during excavation. Compared with the traditional methods, such as fault tree analysis, the proposed approach can more accurately illustrate the dynamic and updated features of hydrogeological design and construction variables as construction progresses on the basis of metro construction field data, which can address the risks in uncertain environments and achieve dynamic control during the entire construction process. The procedures include risk identification, sample collection, model building and validation, risk analysis and reasoning, and real-time control measures. The proposed model was applied in the metro station construction project, in Wuhan Metro Line 7. Results showed that the proposed risk analysis method can achieve real-time risk analysis, which includes pre-accident, during-construction, and post-accident control, to ensure construction safety at the station.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.