Abstract

1. Crater blasting by trench and pit explosive charges made it possible in the shortest time to open and subsequently eliminate the cofferdams of the diversion canal at the construction of the Hoa-Binh hydro development. 2. For using the available experimental and calculation-methodological principles of crater blasting in the less studied practice of blasting cofferdams and embankments, it is expedient to keep as one of the main calculation parameters the “index of action of the blast,” having transformed it to the ratio of the depth of the blasted cut and depth of the charge.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.